The City is in the preliminary planning stages to perform utility repairs to infrastructure beneath Highway 59 and Highway 108. This is a joint project with MNDOT.
An advisory committee will be meeting throughout CY2019 to discuss and develop the project.
A public input meeting was held at LREC on April 25, 2019. Information was shared and there were good questions and comments received from the public.
Another public input meeting was held at LREC on May 23, 2019, at 7:00 p.m.
A third and final public input meeting was held at the Pelican Rapids High School Auditorium on July 18, 2019 at 7:00 p.m.
An advisory committee recommendation will be made to the city council in September 2019.
Update 12-04-2019 The city council has accepted the concept options that were identified as part of the public input meeting process. Those concepts will now be used to determine the city's cost-share for the Complete Streets part of the project. Over the next several months the city and MNDOT will move into design phases of the project.
Update 05-19-2020: MNDOT has selected an engineering/consulting firm for this project. An initial meeting of all partners will be happening soon with the intent of familiarizing all with the scope of the project. Advisory committee meetings will start Fall/Winter 2020. There are several community input meetings being planned as a part of the design stages of the project.
Update 08-05-2022: A virtual pubic meeting was held on April 8, 2021. At this public meeting the concept plans were presented. Final Plans are now at the 30% design stage. The 30% plan set consists of 7 documents that are listed at the bottom of this page.
Mini Roundabout vs Stop Light concept:
- Large truck nb left turn to wb and following it to the wb to nb right turn - https://youtu.be/vxpN-ANiRbY
- Large truck sb left turn to eb and following it to the eb to sb right turn - https://youtu.be/04O1Q_Rloec
- Small truck sb to wb right turn at east mini-roundabout - overlap into opposing thru - No curb hit - https://youtu.be/NbDX39eFRUI
- Small truck sb to wb right turn at east mini-roundabout - no overlap - curb hit - https://youtu.be/e_Eebq6LdM4
- Small truck eb to nb left turn at east mini-roundabout - https://youtu.be/csh-V1bxqec
- Small truck eb thru both mini-roundabouts - https://youtu.be/lP7J-f9gZ2E
190305 Pelican Rapids Advisory Committee Meeting 1 notes
1900327 Advisory Committee Meeting 2 notes
190523 Pelican Rapids Complete Streets open house 2 dot boards
12567 Presentation Open House 3 LR
12567 Pelican Rapids Complete Streets Report Final 190910
8 - TH 59 108 Pelican Rapids Complete Streets One Pager
5618-117 Citizen petition reponse
SP5618-117 TH59 City Lighting Plans1 30% Planning Stage Document
SP5618-117 TH59 City Utility Plan1 30% Planning Stage Document
SP5618-117 TH59 Existing Drainage Map1 30% Planning Stage Document
SP5618-117 TH59 Plans1 30% Planning Stage Document
SP5618-117 TH59 SEQ1 30% Planning Stage Document
SP5618-117 TH59_XSections1 30% Planning Stage Document